Neilcott Construction Limited

Commercial

Sector Commercial

City of London – Alfred Place

City of London – Alfred Place CAT A Strip Out Bespoke Acoustic Floor Solution Busy Central London Location Info box:Client: City of LondonProject Manager: Gerald EveValue: £2.7m The project delivers two floors of strip out to CAT A installation of approx. 12,000 sq. ft and a bespoke acoustic floor solution. Based in a busy London location, we are especially considerate of the movement of traffic and the safety of pedestrians, keeping good channels of communication open with all stakeholders and the community. We achieved an Excellent 45/45 CCS Score. Activity we have conducted on site has included supporting the local community through the dog walking bowl, providing a space for rough sleepers to use overnight and working with merchants to reduce the level of plastic packaging entering our site. All of which has contributed to such a brilliant score.  

City of London – Alfred Place Read More »

Redchurch Street

REDCHURCH STREET Basement Complex Logistics Rooftop Extension Info box:Client: Raycliffe RedArchitect: 3144 ArchitectsValue: £2.5m The project involved the renovation, structural alteration and extension of an existing building situated at 58-60 Redchurch Street, Shoreditch, London E2 The works included the addition of new partial basement, the addition of third floor and partial fourth floor using light weight construction techniques. Retention of existing ground floor retail spaces with associated use within the new basement. Allowance was also made for Allpress Espresso to retain possession of part of the property throughout the build period. The upper floors provide 16 hotel rooms for boutique hotel, Soho House. Significant structural alterations included reconfiguration of the staircore and the addition of a new lift, removal and lowering of the ground floor slab including temporary propping, demolition of a rear extension and the construction of a new infill. The fenestration and façade infill panels were also replaced. A double boarded scaffold gantry was erected at first floor level spanning across the Club Row pavement. An access scaffold was erected off of the gantry and a goods hoist located on the gantry. Temporary steelwork was erected at roof level to support the existing roof structure where it abuts the Club Row party wall. Temporary propping was installed to eliminate the risk of any movement to the Club Row party wall A significant driver behind this complex project was the desire to achieve occupation as early as possible to commence trading in the Autumn to capture Christmas trading as both retail units had been pre-let.

Redchurch Street Read More »

BOROUGH MARKET Complex Logistics Occupied Site Info box:Client: Guy’s and St Thomas’ Hospital, NHS Foundation TrustArchitect: ADP Architecture        Quantity Surveyor: Sweett Group             Project Manager: Sweett GroupValue: £2m Since 2005 Neilcott have been a preferred status contractor for the Trustees of Borough Market in the redevelopment and regeneration of the Market and associated buildings. In its historic position opposite Southwark Cathedral, Borough Market is clearly in a Heritage area so there are strict limits on changing the design. Working in close liaison with the Client and the Architect, Neilcott drew upon our experience of refurbishments and construction projects, value engineering the initial designs in order to meet the client’s budget. Of particular note is Jubilee market which was stripped out and refurbished to capture its original glory. The project, valued at circa £800k, involved the dismantling of the existing cold store chillers, a mezzanine Floor was constructed in creating a new first floor level demise for future tenants, New lighting was installed to the lower ground units. A new power supply cable was installed from the existing sub mains via the underground basement and existing ducting pits to feed the newly formed units and lift. The metal staircases were enclosed in 1 hour fire rated plaster board partitions. All common part areas were fully decorated and non-slip flooring was included in the toilet areas. Neilcott were well aware of the constraints of working within a lively market and have contributed to the improvement of Borough Market with a number of smaller projects, including re-configuring Middle Road, installing additional storage rooms and refurbishment of Booths Arch etc. All these projects involve working in and around operational areas and ensuring the on-going successful operation of the market.

Read More »

St Andrew’s House

ST ANDREW’S HOUSE Complex Logistics Façade Refurbishment Cat A Fitout Info box:Client: Axa Real EstateArchitect: DLA Design London                 Quantity Surveyor: Sweett Group             Project Manager: Morgan Capital Projects LtdValue: £15.3m St. Andrew’s House is located in the City of London, home to some of the World’s leading international financial and business operations. Neilcott was appointed to undertake a refurbishment and extension of St Andrew’s House including some structural alterations and a refurbishment of the existing façade including new glazing. Construction works comprised: Refurbishment to Category A standard of a single existing office building over 13 levels comprising one full basement, one part-basement, ground plus eight upper storeys plus one new office level and a rooftop open plant. There is a retail area at basement level. New office entrance and rear cycle entrance to Thavies Inn. New glazing to the alleyway elevation. The existing life safely sprinkler system will be replaced and serve all floors and the elevation drench system will be removed. All existing casement windows were replaced with a new single pane. All curtain walling was retained, repainted, re-glazed and be provided with new external caps. The new storey at roof level provides additional premium office space and is accessible via four new lifts and the existing fire escape stair and lift core at the rear of the building. New plant serving the building is located above the new roof level. The existing lightwell adjacent to No.6 St Andrew Street was infilled with new slabs at all levels from ground to ninth floor. The existing lift circulation core previously included two lift shafts, which were removed and the corresponding voids infilled. As part of the alterations, four new lifts were installed through the existing building structure to serve all levels from ground floor to ninth floor. There is an additional existing fire-fighting lift to the rear of the building which was replaced by a larger lift.  Alterations at first floor level include the repositioning of existing structural elements on the St Andrew Street elevation to enable re-modelling of the front elevation. The removal of these elements greatly improved the general appearance of the building and increased the natural light level inside the building at first floor

St Andrew’s House Read More »

Devonshire Street

DEVONSHIRE STREET Listed Phased Healthcare Conversion Party Wall Agreements Info box:Client: Howard de Walden EstatesArchitect: ESA                                        Quantity Surveyor: Sweett GroupValue: £8.5m The conversion of a terrace of 6-storey Grade II Listed former town houses from their diplomatic use into medium-sized high quality offices and medical consulting rooms.  The scope of works significantly improved the internal environment compatible with the building’s new use. In addition a new single storey extension with a mansard roof was constructed on the rear roof area to match the surrounding buildings and a new timber structure was erected in the garden to house the required mechanical plant.  Heritage works required protection and restoration of listed features, including panelling, architraves, stonework, external railings and fixtures and fittings. 

Devonshire Street Read More »

Canna Enterprise Centre

Canna Enterprise Centre The new development provides a council depot in connection with Rushmoor Borough Council’s refuse and street cleansing services. Steel FrameAdjoining OccupiersExternal Works Client: Rushmoor Borough CouncilArchitect: Forum            Quantity Surveyor: MTP Consultants       Project Manager: Rushmoor Borough CouncilValue: £2.6m The new development provides a council depot in connection with Rushmoor Borough Council’s refuse and street cleansing services. The site is also to be used for overnight parking or refuse and street cleaning vehicles with an ancillary office together with staff car parking and welfare facilities, a vehicle maintenance workshops, storage areas for operational equipment, a fuel area and a vehicle wash down area. After unloading the collected waste and recycling materials at the disposal site all vehicles would return to the site for vehicle maintenance and overnight parking. The project included reinforced concrete surfacing which is typical of the Enterprise Estate and surrounding industrial area. There is also permeable surfacing laid in the south of the site for the staff and vehicle parking area. The total site measures approximately 7,550m 2. The project creates approximately 820m2 of built floor space through the creation of an office (280m2) and workshop building (540m 2) towards the south of the site. There is also a 460m2 storage area, which comprises both outdoor and indoor storage space. The site provides overnight parking for up to 28 Heavy Commercial Vehicles (HCVs) consisting of 16 spaces for RCVs and 12 for road sweepers and 7.5 tonne trucks. As well as 46 (2 disabled) staff car parking spaces and cycle storage at the south of the site. GALLERY IMAGES FOR Canna Enterprise Centre Previous Next

Canna Enterprise Centre Read More »

Heal’s Building

HEAL’S BUILDING Complex Logistics Occupied Building Partially Listed Info box:Client: Threadneedle Asset ManagementArchitect: Various                                Quantity Surveyor: Workman LLP  Project Manager: Workman LLPValue: £8m Neilcott are Threadneedle Property Investment Ltd’s construction partner for the provision of construction services relating to the Heal’s Building in Tottenham Court Road, London. The building, which is partially listed, comprises over 150,000 square feet of mixed use space over six floors including retail, residential and office space. We have been engaged for over 10 years undertaking numerous external fabric repairs, including roof and elevation replacement and repairs. During this period Neilcott have undertaken approximately 50 different refurbishment and internal fit-out contracts totalling over £8m in value. Projects are on occasion subject to open tender in order to benchmark construction costs however most are procured by direct negotiation based upon agreed rates and open book tendering for specialist trades. A wide range of projects have been undertaken, with recent projects including a £1.5m internal refurbishment project to retail and office spaces, multiple roofing replacement works (including slate, lead, single ply, rubber bond and asphalt roof types), green roof installation, repairs to existing windows, gutters, as well as installation of new signs and glass replacement etc. All Heal’s Building works are overseen by our Special Works department, enabling strong constructive working relationships to be developed over time. “Neilcott are dedicated to ensuring our needs are fully met at all times and regularly go above and beyond. They are considerate and sensitive in the way they undertake their work, particularly in occupied environments.”                                                                      Tony Simpson – Workman LLP

Heal’s Building Read More »

Prime House

PRIME HOUSE Occupied Site Steel Frame Network Rail BAPA Info box:Client: Tindall OverseasArchitect: Jestico & Whiles              Quantity Surveyor: LG PartnershipValue: £3.6m Neilcott was responsible for the construction of a new two storey office block built over a Network Rail tunnel, located less than 1500mm below ground level. Strict methods of working set out in a BAPA were imposed by Network Rail which dictated that no load could be imposed upon the tunnel lid during construction. The existing buildings consisted of a largely five-storey building fronting Finchley Road (The Front Building) and a largely one storey extension (The Rear Building) behind which was the location for the two storey office extension. The Front Building comprises ground and first floors in use commercial by Alied Irish Bank together with access to residential use over at second to fourth floor levels. This residential element remained occupied during the Works and due allowance for the continuing proper, safe, secure access and occupation of this residential element was made throughout the course of the works including maintaining all services including all air conditioning, ventilation and cooling systems and maintaining liaison with the residents throughout. Foundations comprised piles installed alongside the tunnel with capping beam. Insitu concrete ground beam spanning 20m between capping beam were constructed using falsework suspended from pairs of pre-cambered steel sections, prior to post tensioning in the final position. Infill between the beams was formed using an omnia permanent formwork system. The structure for the extension was supported upon specialist bearings inserted between the piled substructure and the superstructure in order to eliminate transfer of noise and vibration from the rail tunnel to the completed building. With no possibility of intermediate support across the 20m span the first floor structure was suspended from steel trusses at roof level. A glazed atrium area joined the new building to the existing development.

Prime House Read More »

Marylebone Lane

MARYLEBONE LANE Steel Frame Basement Temporary Works Party Wall Info box:Client: Howard de Walden EstatesArchitect: Capita plcQuantity Surveyor: Robinson Low Francis                                                          Project Manager: Capita plc                Value: £7m This project for Howard De Walden Estates included substantial reconstruction of parts of the building behind retained facades and reconfiguration of both residential and retail units. The smaller retail units were combined into 3 larger units with the exception of one retail unit which remained unchanged and operational throughout the works. The 7 existing multi-storey apartments were replaced with 14 new single floor apartments and 2 duplex apartments. To comply with the requirements of disproportionate collapse, large sections of the existing timber floors were replaced with new concrete floors, supported in a new steel frame constructed within the constraints of the existing shell. Additionally, new steelwork was installed within the existing retained timber floors/walls. A temporary roof maintained a waterproof environment during the removal of the existing roof and rear facade. Internal floors had new support steels installed, with other strengthening works to form new opening in party walls.

Marylebone Lane Read More »